Ladox as a company carefully test her supplied product through the quality control section of the organization to ensure that they manufacture supply products that has no harm to the environment, either on plants, animals or its surrounding of operations, for example depletion of the ozone layer by HCFC refrigerants.
The project Engineer has overall responsibility for the successful execution of the project, including conformity with CLIENT'S quality management system and meeting project objectives. Site inspectors (cars) shall ensure project activities are carried out according to documented procedures, guidelines and instructions.
Ladox as a technical company has taken it as a point of concern to do away with all products that does not comply with international and national standards such as ISO quality, IEEE, IEC, IEMC etc. she also makes sure she complies with the standard of quality supply to its host companies.
Ladox has made it a point of concern to ensure that her supervision i s based on recommendation, qualification, training and seasoned personnel who are always strict to, and at all times ready to carry the company along by making proper supervision of workers welfare, remunerations, proper supervision of our client facility and equipment.
Provide products and services that are in accordance with all specified CLIENT requirements and commonly accepted standards and specifications within budget and on time. Meet the needs and requirements of stakeholders and return on investment. Ensure continuous performance improvement, through early identification of quality assurance matters and feedback to the system. Timely execution of projects to technical standards, operations maintainability and applicable statutory regulations at the lowest possible cost, and without loss to lives and assets.
As a company we believe that health is wealth and that good health promotes a healthy living which is why Ladox Eng. Coy Ltd has carefully trained some graduate personnel through the HSE matters of the organization, so as to promote good health, proper working environment, for technicians and clerical personnel’s, to co-ordinate the gap between the management and the contractor personnel. To ensure daily toolbox talks are highlighted and monthly HSE meeting are held, to highlight all the activities and performances of the company, and to seek area of new industrial development and improvement. Ladox through her safety officers has been able to promote community affairs, security alertness to all personnel involve in the contract operations, to make sure our host communities are in-cooperated into our contract workforce, to eliminate potential accidents / incidents, which could either result in injury of personnel or damage to the equipment, environment or client equipment or facility.
LADOX ENG. COMP. LTD shall provide a list of staff to be used on each project, stating their qualifications, experience and competencies. Their duties shall be specified, including engagement on work programmes of the company (LADOX).
Project files and associated records are to be retained for a period of three years after the retention period has expired before consideration for disposition. All contract‑specific compilation files at least once a month.
The primary inputs to this project are the installation manual / job procedures provided by customer for proper execution of the project. Customer communication and project meetings shall be held at the beginning of each job activity and as needs arise.
All necessary resources for the execution of this project shall be the responsibility of LADOX ENG. COMP. LTD as specified by the contract.
Compliance Certificates
Browse validated documents and compliance credentials.
The various designs for this project shall be in accordance with CLIENT, Design and Engineering practices/standards.
Installation, testing, and commissioning shall comply with project plan, site working instructions and standard procedures.
Equipment and materials required shall be purchased by LADOX ENG. COMP. LTD from approved sources and handled under defined conditions.
Customer materials handed to LADOX ENG. COMP. LTD for proper handling/recording shall be safeguarded and returned as required.
Adequate procedures shall apply to the delivery of services under this project.
All works that have no record or do not conform to requirement shall be reviewed to meet CLIENT standards.
The progress of the project shall be recorded daily and weekly by responsible personnel, with records retained as part of final documentation.
Audits will confirm effective implementation of the quality plan and achievement of objectives; non‑conformities shall be addressed and closed out.